GTE
-
Florida
Unbundled Network Element (UNE) Non-Recurring Cost Study
NOMC and
NASSC
-
Data
Collection
The cost team conducted Work Sampling studies in the Durham NOMC and the
San
Angelo NASSC in 1999. Work Sampling is
a
method of work measurement. In this
study, the cost managers estimated the proportions of time spent by the Service
Representatives on the pre-ordering and ordering activities. These estimates are based on
a large number of observations. The underlying assumption is that the proportion
of
time
the activity is observed in the sample will be the proportion of time spent
on
the activity
in general. After the cost team recorded their observations for the Work Sampling study,
they worked with SMEs to determine the frequency
of
the activities for each of the order
processing modes. Additionally, SMEs provided time estimates for activities that were
not observed during the study. (See Appendix Tab
16
for details
of
the Work Sampling
study.)
NOMCZNASSC: UNEs and
Services
The NOMCNASSC process all of the CLEC LSRs for Local Wholesale Products. Local
Wholesale Products include the following
UNEs:
Exchange
-
Basic UNEs:
+
2-wire Analog Loop
4-wire Analog Loop
NID
Analog Line Side Port
+
Vertical Features
*INP
+
Subloop Distribution-Standard
+
Subloop Feeder-Standard
Unbundled Customer Serving
Terminal (drop)
AdvancedlSpeeial
-
Basic UNEs:
+
2-Wire Digital Loop
4-Wire Digital Loop
Exchange -Complex UNEs
+
CentraNet Port
Switch Feature Group
+
Complex Non-digital Loop
+
Complex Digital Loop
+
Subloop Distribution
-
Non-
+
Subloop Feeder
-
Non-loaded
+
Loop Conditioning
+
Line-sharing
Advanced/Special
-
Complex
UNEs:
+
ISDNBRIPort
loaded
+
DS1 Loop
'
DS3Loop
The cost team calculated the ordering costs for Local Wholesale
UNEs
on aper order
basis.
GTE costed the following NOMC/NASSC responsibilities for
UNEs:
CLEC Establishment
-
As described in the Introduction, GTE establishes an account in
each state that the CLEC requests. Once the accounts are established, the CLEC can
submit LSRs to GTE. The NOMC processes all
of
the CLEC Establishment requests.
14-FL
3
WhOlesale-JuneMW
Page
3
Of
7