GTE
-
Florida
Unbundled Network Element (UNE) Non-Recurring Cost Study
,,---
DBM-
WCC
The cost team developed the time per order worked by DBM by taking the
total productive hours worked during the study period by this workgroup and
dividing by the number of orders worked in the same time period.
The cost team developed the time per order worked by
VIVID
by taking the
total productive hours worked during the study period by this workgroup and
dividing by the number of orders worked in the same time period.
Cost managers used data from the TBS database to determine the number and
type of orders or lines
as
appropriate worked by each of the following BRPC
groups: SOE, HiCap Prework, Design, and Admin. Only those orders
handled by a workgroup during provisioning are included in determining that
group’s cost per order provisioned.
The cost per order for each workgroup is developed separately based
on
the
number of orders worked by that group and the group’s productive hours
spent
on
those orders. The costs for AdvancedSpecial
-
Basic and
AdvancedSpecial
-
Complex are calculated separately since there are
different provisioning requirements for each type of order.
The section manager of the BRPC Testing group conducted a time study to
determine the productive hours attributed to circuit testing. This time was
applied to all inward (“I”) orders since all newly installed Advanced/Special
UNEs
require
this
type of testing activity. Outward
(“0)
orders do not
require a touch by the Testing group.
EPG Management Support personnel
in
the EPG determined the time-per-
activity by using reports for EPG clerks’ productive hours and number of
orders worked. The EPG supervisors
also
conducted studies to determine the
amount of time spent
on
non-recurring activity versus recurring activities.
VIVID
BRPC
EPG
Costs
of
Exchange UNE/UNE-Ps
and
Other Services
GTE costed the following
UNE
activities:
New Orders for Exchanee
-
Basic
UNE
:
The FAC manually assigns the cable
paidcentral office line equipment. If the recent change translations do not download
electronically into the switch, then the Provisioning Support group manually enters the
translations.
New Orders for Exchanee
-
Basic UNE-P: Generally the
LSR
is automatically processed
by
AAIS.
However, when mechanized assignment and translations do not happen. the
FAC and Switch Update group manually provision the order.
#--
15-FL
5
WhDlc~sle
-
June
2wO
Page
5
of
7
Komentáře k této Příručce